💧 La Barrancosa Dam

Argentina · Americas · 50.19°S, 70.12°W

Advertisement

The Complejo Hidroeléctrico Cóndor Cliff (ex-N.K) y La Barrancosa Dam, is a concrete-face rock-fill dam being built on the Santa Cruz River about 115 km (71 mi) west of Puerto Santa Cruz in Santa Cruz Province, Argentina. A consortium led by China's Gezhouba Group was awarded the contract to build the Condor Cliff & La Barrancosa Dam upstream in August 2013. The consortium will also fund the construction. Both dams are expected to cost nearly US$4.8 billion. The dam is being built by Eling Ingeniería, the successor of Electroingeniería of Osvaldo Acosta and Gerardo Ferreyra. The primary purpose of the dam is hydroelectric power generation and its power station will have an installed capacity of 600 MW.

Read the full article on Wikipedia →

Quick facts

CountryArgentina
Continent / regionAmericas
Coordinates (approx.)50.19°S, 70.12°W · view on map

La Barrancosa Dam is located in Argentina, in Americas.

More hydroelectric power stations in Argentina

Agua del Toro Dam · Condor Cliff Dam · El Carrizal Dam · El Chocón Dam · Florentino Ameghino Dam · La Viña Dam · Los Caracoles Dam · Los Molinos Dam · Los Quiroga Dam · Los Reyunos Dam.

Coordinates approximate. Introduction & image: Wikipedia (CC BY-SA 4.0), cached 30 days; the page renders even if the feed is momentarily unreachable.

Advertisement
Advertisement