☢️ THTR-300
Germany · Europe · 51.68°N, 7.97°E
Advertisement
The THTR-300 was a thorium cycle high-temperature nuclear reactor rated at 300 MW electric (THTR-300) in Hamm-Uentrop, West Germany. It started operating in 1983, synchronized with the grid in 1985, operated at full power in February 1987 and was shut down on 1 September 1989.
The THTR-300 served as a prototype high-temperature reactor (HTR) to use the TRISO pebble fuel produced by the AVR, an experimental pebble bed operated by VEW. The THTR-300 cost €2.05 billion and was predicted to cost an additional €425 million through December 2009 in decommissioning and other associated costs. The German state of North Rhine Westphalia, Federal Republic of Germany, and Hochtemperatur-Kernkraftwerk GmbH (HKG) financed the THTR-300’s construction.
Read the full article on Wikipedia →
Quick facts
| Country | Germany |
|---|---|
| Continent / region | Europe |
| Coordinates (approx.) | 51.68°N, 7.97°E · view on map |
THTR-300 is located in Germany, in Europe.
More nuclear power plants in Germany
AVR reactor · Biblis Nuclear Power Plant · Brokdorf Nuclear Power Plant · Brunsbüttel Nuclear Power Plant · Emsland Nuclear Power Plant · Grafenrheinfeld nuclear power plant · Greifswald Nuclear Power Plant · Grohnde Nuclear Power Plant · Großwelzheim Nuclear Power Plant · Gundremmingen Nuclear Power Plant.
Advertisement
Advertisement